Key points
- Standard: GB 18173.2-2014; graded and tested by an accredited third-party laboratory.
- Grades: Type 651 single bulb: CB-300×6 to CB-500×12; type 652 double bulb: CB-300×6 to CB-500×12; type CP: CP-300×6 to CP-400×10.
- Price: RMB 30–120 per metre, depending on size, type and thickness. MOQ: 50 m minimum; orders up to 1,000 m ship in 1 day.
- Inspection commitment: pre-purchase sampling, third-party re-testing, full refund if a test fails.
Overview
Buried rubber waterstop is moulded from natural or synthetic rubber and embedded in concrete during casting to block seepage at joints. It serves tunnel secondary lining joints, metro station and running tunnel joints, utility tunnel joints, hydraulic powerhouse and box culvert settlement joints, and high-water-pressure basement joints.
Technical data
| Property | Measured | Requirement |
|---|---|---|
| Width | 450.2 mm | 450 ±9 mm |
| Thickness | 12.04 mm | 12 mm |
| Hardness (Shore A) | 61.4 Shore A | 60 ±5 Shore A |
| Tensile strength | 17.2 MPa | ≥15 MPa |
| Elongation at break | 451 % | ≥380 % |
| Compression set, 23 °C × 168 h | 15.5 % | ≤20 % |
| Compression set, 70 °C × 24 h | 24.6 % | ≤35 % |
| Tear strength | 36.7 kN/m | ≥35 kN/m |
| Brittleness temperature | No failure at -45 °C | ≤-45℃ |
| Tensile strength after hot-air ageing | 12.5 MPa | ≥9 MPa |
| Elongation at break after hot-air ageing | 455 % | ≥300 % |
Advantages
- More than 20 moulds covering the sizes commonly specified in China, plus custom profiles to drawing.
- Standard production at 10 MPa; 15 MPa and 20 MPa grades available to order.
- High elasticity and elongation — the waterstop follows structural movement. Tear-, ageing- and chemical-resistant.
- Mechanical grip on the concrete resists debonding, giving strong pressure sealing and long service life.
- Rush orders accepted. Pre-purchase sampling, third-party re-testing, full refund if a test fails.
Applications
- Tunnel secondary lining joints
- Metro station and running tunnel joints
- Utility tunnel joints
- Hydraulic powerhouse and box culvert settlement joints
- High-water-pressure basement joints
- Reservoirs and sewage basins
Installation
- Install on centre: the centre bulb must align with the joint centreline, with no offset.
- Fix with rebar clamps or dedicated clamps on the edge flanges only. Never pierce the body with wire or nails.
- Splice by hot vulcanisation (dedicated mould plus uncured sheet). Simple adhesive butt joints are not acceptable.
- Cast symmetrically from both sides and vibrate in layers to prevent the waterstop rolling or collapsing. Never let the poker touch the waterstop.
- Keep splices away from corners and stress concentrations, and stagger them.
FAQ
Type 651 has a single centre bulb, type 652 has two. 300×8 means 300 mm wide and 8 mm thick — the most common size in practice. Wider options include 350×8, 350×10 and 400×10. Always start from the type and size on the design drawing.
Four points: (1) the centre bulb must align with the joint centre and be fixed with added rebar or dedicated clamps — never nail through it; (2) the waterstop must lie flat, not rolled or twisted; (3) cast half embedded and half exposed, and vibrate thoroughly so concrete beds onto the rubber; (4) keep aggregate and rebar ends from puncturing it, and repair any damage immediately.
No. There are two methods: (1) cold splice — grind the ends back 5–10 cm, apply dedicated cold-splice adhesive and press; fast and adequate for ordinary work; (2) hot vulcanised splice — use a heated mould with uncured sheet at 140–150 °C on site to reach near-parent strength, which is mandatory on important works.
Buried sits in the middle of the concrete and is the default choice. Surface-mounted is bonded to the outside face and works with the membrane for repair and secondary sealing. Steel-edge adds galvanised steel strips for mechanical interlock and higher pressure resistance, used in critical high-pressure movement joints. Important works often use buried plus surface-mounted.
Price and delivery
| Reference price | RMB 30–120 per metre, depending on size, type and thickness |
|---|---|
| MOQ and lead time | 50 m minimum; orders up to 1,000 m ship in 1 day |
| Packaging | Palletised drums, woven bags or cartons; LCL and FCL shipping available. |



Related products
Contact
- Company
- Hebei Hualing Rubber Co., Ltd.
- Address
- No.97, Xifantun Village, Wuqiang Town, Wuqiang County, Hengshui City, Hebei Province, China
- Contact
- Mr. Hou (Sales Manager)
- Tel
- +86 13081809758
- mifengjiaochang@163.com

